MAKİMSAN
Client | Republic of Turkey Directorate General of Turkish Highways 4th Regional Directorate | |
Total Length of Road | 3.600,00 m (0+200.00-3+800.00) | |
Total Underpass Length | 967 m | |
Length of Underpass Double-Track Tunnel | 490 m | |
Diaphragm Wall Space | 75.000,00 m2 | |
Total volume of cut, sub-borrow and engineering structures excavation | 420.000,00 m3 | |
Volume of Borrow Pit Excavation | 85.000,00 m3 | |
Volume of Plant mix sub-base and plant mix base | 92.000,00 tons | |
Volume of Bituminous Hot Mix | 85.000,00 tons | |
Length of Bored Piles | 6.480,00 m | |
Volume of Ribbed Bars | 17.500,00 tons | |
Volume of Concrete | 145.000,00 m3 |